Solutions for streetcars

State-of-the-art solutions for tramway tracks: wells and service systems that protect installations, improve cable routing and reduce maintenance costs. Durable, lightweight and tailored to field conditions.

Wells
tramway

TP-type streetcar wells are installed on tracks and are used to lay induction loops that control streetcar traffic

Innotechnika provides modern and durable solutions to support the safe and efficient operation of tramway tracks. Our systems are based on Polipit plastic, which combines resistance to loads and environmental conditions with low weight and easy adaptability to different terrain conditions.

Among the solutions offered are those that enable:

  • Protection of installations and traffic control systems,
  • Optimizing the process of routing and fixing cables,
  • Minimizing the risk of damage to infrastructure by track vehicles,
  • improving durability and reducing operating and service costs.

TP 20/5 IN B-125

  • External dimension
    2170 x 590mm
  • Internal dimension
    2020 x 440mm
  • Well height
    135mm
  • the body of the well can be loaded with up to 12.5 tons (B-125) without the need for concrete
  • SMC plastic covers in accordance with PN EN 124:2000

DATA SHEET – PDF

TP 20/7 IN B-125

  • External dimension
    2090 x 750mm
  • Internal dimension
    1940 x 600mm
  • Well height
    135mm
  • the body of the well can be loaded with up to 12.5 tons (B-125) without the need for concrete
  • SMC plastic covers in accordance with PN EN 124:2000

DATA SHEET – PDF

TP 20/7 IN D-400

  • External dimension
    2070 x 770mm
  • Internal dimension
    1920 x 620mm
  • Well height
    200mm
  • the body of the well can be loaded up to 40 tons (D-400) without concreting
  • SMC plastic covers in accordance with PN EN 124:2000

DATA SHEET – PDF

TP type tramway wells:

ModelBody loadCoverExternal dimensionInternal dimensionHeight of the well
datasheet
TP 20/5 IN B-125Up to 12.5 t (B-125),
without concreting
SMC plastic,
PN EN 124:2000
2170 × 590 mm2020 × 440 mm135 mmPDF
TP 20/7 IN B-125Up to 12.5 t (B-125),
without concreting
SMC plastic,
PN EN 124:2000
2090 × 750 mm1940 × 600 mm135 mmPDF
TP 20/7 IN D-400Up to 40 t (D-400),
without concreting
SMC plastic,
PN EN 124:2000
2070 × 770 mm1920 × 620 mm200 mmPDF

Lubricator
crossovers

In addition, we have developed an innovative retractable grease trap that not only improves ride comfort and safety, but also eliminates the problem of interfering with track space.

Automatic streetcar lubricators are modern, fully automated devices designed for maintenance-free lubrication of switches and rails in curves and turnouts of track infrastructure. The system makes it possible to precisely dispense the appropriate amount of grease depending on the number of passing rail vehicles – detected by a sensor – or at preset, fixed time intervals.

The unit is mounted below the track surface, in a specially designed well with a service elevator that provides easy access and full protection from flooding.

The design of the lubricator is based on proven technical solutions that guarantee:

  • High reliability and efficiency of operation,
  • Long life of all components,
  • minimum service requirements.

These features make the automatic streetcar lubricator the most effective solution for maintaining and operating urban tracks.

Investments on which
you will find us

  • Track modernization

    How to upgrade the track to work reliably for years? Traditional ways of fixing loop wires often fail – the wires are prone to damage, and this means failures and additional costs. In our solution, specially designed tramway wells played a key role, protecting the installation, facilitating servicing and increasing the life of the entire infrastructure.

  • Poznan – Switchboards in the Old Market

    Poznan’s Old Market has gained a new face – also thanks to Innotechnica. Modern power distribution boards, invisible in everyday life, provide energy for gardens, fairs and concerts. Discreet, durable and resilient – they support the life of the city while preserving its aesthetics.

  • Foundations for car loaders in Puck

    Modern, lightweight and environmentally friendly – such are the Polipit plastic foundations that we used for the installation of electric car chargers in Puck.
    See how step by step this realization was made – without concrete, without heavy equipment, but with precision, speed and concern for the environment.

  • Revitalization of the market in Lubin

    During the revitalization of Lubin’s market square, Innotechnika’s solutions were used – teletechnical wells and underground power distribution boards made of Polipit plastic.

  • Discreetly hidden in Gdynia

    Our underground power switchboards became part of the reconstruction of Abrahama Street in Gdynia – a project implemented as part of the 2023 Civic Budget.
    Blended into the urban space, covered with paving stones, they remain almost invisible while providing reliable power supply in the new pedestrian- and bicycle-friendly space.

  • Modernity with respect for the history of Lublin

    Since 2018, Innotechnika has been supporting the operation of Lublin’s unique space – from underground power switchgears to telecommunication wells that remain almost invisible, yet crucial to the operation of the square.
    This is a place where technology and history go hand in hand, creating the heart of Lublin anew

Innotechniki Blog:
knowledge, solutions and inspiration

Contact us

Call +48 58 573 55 66, write biuro@innotechnika.pl
or fill out the form – we will contact you: